We’ve been working on this kitchen remodel this month. Normally, our spring projects start in spring, but we decided to start a little earlier this year.
The project has involved:
- Knocking down a wall and beaming the span.
- Rerouting the electrical
- Rerouting the water line for the fridge
- Relocating the fridge
- Building an island
- Relocating the oven
- Plumbing a gas line for the oven
- Switching from a single basin to double basin sink
- Installing a new garbage disposal
- Building new cabinets
- Tearing out tile and installing new flooring
Phew! We’re almost done.